US 287 Corridor Interstate Feasibility Study

CATEGORY

Planning & Implementation

DESCRIPTION

TxDOT’s TPP Division conducted the US 287 Texas Corridor Study to prioritize multimodal safety and mobility improvements and evaluate the feasibility of upgrading the 600+ mile corridor from Port Arthur to Future I-27 to interstate design standards.

As part of the study, Novus evaluated existing socioeconomic characteristics for the corridor’s three segments: Northwest, Central, and Southeast. Novus utilized the Statewide Analysis Model (SAM) and Woods & Poole data to analyze and summarize future socioeconomic characteristics and develop the Economic Impact Analysis (EIA). Novus also developed an economic analysis using TREDIS, TDM for proposed improvements along the 600+ mile US 287 corridor to support the Interstate Feasibility Analysis.